Home Again with Bob Vila
Season 9
199826 episodes
Episodes
- E1
Accessible Home: Housing Project Introduced
1998-09-07
In a neighborhood outside of Boston, work begins on an affordable housing unit for a person with disabilities. Included: soil decontamination and foundation excavation.
- E2
Accessible Home: Framing and Shingling
1998-09-14
Asphalt shingles and flashing are added to the roof, and walls are prepped with special blocking for mounting safety handrails. Also: tips on paneling and working with a culturally diverse crew.
- E3
Accessible Home: Installing Siding
1998-09-21
A special weather- and fire-resistant siding is installed. Also: finishing the basement work and running electrical wiring.
- E4
Accessible Home: Insulation and Door Installation
1998-09-28
Insulation work is begun and trenches are dug for the new water service. Also: Boston Mayor Thomas Menino stops by to help install the front door.
- E5
Accessible Home: Designing for the Disabled
1998-09-28
Bob Vila talks with experts to understand the difference between adaptability and accessibility when designing homes for disabled people.
- E6
Accessible Home: Building the Railing System
1998-10-12
The railing system is built and integrated with the front porch columns. Also: a tour of Boston's Roxbury community, making a comeback from urban blight.
- E7
Accessible Home: Building the Railing System Stairs
1998-10-19
Landscaping begins, the modular stair system is anchored, and the front porch ramp is built.
- E8
Accessible Home: Installing a Tankless Water Heater
1998-10-26
Recessed lighting and a cost-effective tankless water heater are installed. Also: a tour of a lighting manufacturing plant.
- E9
Accessible Home: Shower Stall and Drywall
1998-11-02
Drywall goes up and plumbing begins on a shower stall designed for wheelchair users. Included: a field trip to learn about new trends in community living.
- E10
Accessible Home: Accessible Fixtures and Elevator
1998-11-09
The elevator is put in, and bathroom fixtures are installed along with hardware specially designed for people with disabilities.
- E11
Accessible Home: Energy Efficiency Discussion
1998-11-16
The energy-efficient boiler is installed, and Bob Vila heads to Germany for a tour of the plant where the boiler was made.
- E12
Accessible Home: Lockset Installation
1998-11-23
A specially designed lock set is installed, along with an energy-efficient, side-by-side washer-dryer.
- E13
Accessible Home: Accessible Unit Tour
1998-11-30
Bob Vila tours the completed unit, paying special attention to the wheelchair-accessible kitchen with energy-efficient appliances.
- E14
Loft Conversion: Loft Conversion Initial Tour
1998-12-07
Conversion of an old fur storage building into a residential loft begins in Boston's Leather District. Included: a walking tour of other well-preserved antique commercial buildings in the neighborhood.
- E15
Loft Conversion: Plumbing, Heating and the 'Big Dig'
1998-12-14
Installation of plumbing and heating begins. Included: a look at the progress of Boston's famous highway project, the 'Big Dig'.
- E16
Loft Conversion: Plastering the Loft
1998-12-21
Plastering is begun on the project, while Bob Vila takes a trip to Cambridge to meet a landscape architect who converted an industrial building into a spacious home and office.
- E17
Loft Conversion: Elevating the Kitchen and Bedroom
1998-12-28
A platform is built to raise the kitchen and bedroom above floor level. Included: a visit to a nearby finished loft.
- E18
Loft Conversion: Paint and Plate Glass Windows
1999-01-04
The entryway and foyer are painted, and the plate glass windows are replaced throughout. Work on the bathroom begins with shower tile installation and lavatory plumbing.
- E19
Loft Conversion: Framing a Wall With Built-in Cabinets
1999-01-11
Bob Vila addresses the challenge of framing and plastering a 48-foot wall with an almost imperceptible curve. Plus, built-in cabinets are constructed.
- E20
Loft Conversion: Installing Plumbing Fixtures
1999-01-18
The bathroom progresses with the installation of an electrically powered full-body shower tower, a dual-speed pressurized toilet, and a glass lavatory.
- E21
Loft Conversion: Installing Stainless Steel Countertops
1999-01-25
Installation of the restaurant-style kitchen is begun, and Bob Vila tours the fabrication shop where the steel materials being used were custom-made.
- E22
Loft Conversion: Drywall and Plastering Tips
1999-02-01
Bob Vila offers tips on installing precision drywall and plastering in tricky places. Plus, a bookshelf nook is built and stainless steel appliances are installed.
- E23
Loft Conversion: Installing Track Lighting
1999-02-08
Finishes are installed in the bathroom and elsewhere in the loft, track lighting is put in. Included: a tour of Lightolier's Tech Center to learn about the power of light to change the mood of a space.
- E24
Loft Conversion: Building a Closet System
1999-02-15
Architect Greg Rochlin is on-site to oversee the fabrication of the hallway closet system-- a multicolored design pieced together in Formica laminate. Lighting designer Markus Earley returns with some snazzy fixtures and controls, and the stackable Maytag washer/dryer unit is installed in the closet.
- E25
Loft Conversion: Kitchen Work and Shutters
1999-02-22
Work on the restaurant-style kitchen continues, as the wire shelving system is built and the stainless steel range hood is installed.
- E26
Loft Conversion: Loft Conversion Final Tour
1999-03-01
A tour of the completed conversion project begins with the building's restored facade and ends with the sixth-floor residential loft.