
THE DAYS
Limited Series
20238 episodes
Episodes
E1The Fukushima Daiichi Nuclear Power Plant Is Submerged
7.72023-06-01 · 48m
March 11, 2011; 225 kilometers from Tokyo, a 15 meter high tsunami hits the Fukushima Daiichi Nuclear Power Station, damaging one of the cooling systems.
E2No Need to Evacuate
6.82023-06-01 · 53m
While still unable to get an assessment of the situation from Fukushima Daiichi, the government tells the public to stay calm and remain in their homes.
E3Radioactive Emissions Will Be Minimal
6.62023-06-01 · 57m
Pressure in the containment vessel starts to rapidly rise. With a catastrophic explosion imminent, TOEPCO suggests releasing the gas into the atmosphere.
E4It Would Mean Turning Our Backs on Fukushima
7.22023-06-01 · 56m
With the power still down, the valves will have to be opened manually. With heavy hearts, some workers ask if they can evacuate to a safer location.
E5Our Company Has Lost Its Mind
7.32023-06-01 · 47m
Station Manager Yoshida decides to use seawater as a cooling source, but TOEPCO headquarters tells him to wait for authorization from the administration.
E6I Can No Longer Leave Here Alive
7.32023-06-01 · 53m
When pressure in the containment vessel finally starts to decrease, TOEPCO headquarters want on-site workers to get back to work, but Yoshida is wary.
E7Decide the Conditions for Evacuation
7.32023-06-01 · 55m
As the administration and TOEPCO headquarters grow increasingly impatient, Station Manager Yoshida asks for permission to evacuate some on-site workers.
E8A Scenario of Japan's Collapse
7.32023-06-01 · 66m
The Prime Minister is informed that in a worst case scenario, a third of the country — including the Tokyo area — will become uninhabitable for decades.
