Hometime
Season 24
201026 episodes
Episodes
- E1
Sculpture Studio Extension - Floor
2010-02-06 · 30m
The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.
- E2
Sculpture Studio Extension - Walls
2010-02-13 · 30m
The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.
- E3
Sculpture Studio Extension - Wrap Up
2010-02-20 · 30m
The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.
- E4
Stone Cottage – Cul-De-Sac Prep
2010-02-27 · 30m
The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.
- E5
Stone Cottage – Concrete & Foam
2010-03-06 · 30m
The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.
- E6
Stone Cottage – Instant House
2010-03-13 · 30m
The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.
- E7
Stone Cottage – Roofscape
2010-03-20 · 30m
The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.
- E8
Stone Cottage – Windows
2010-03-27 · 30m
The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.
- E9
Stone Cottage – Concrete Floors
2010-04-03 · 30m
The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.
- E10
Stone Cottage – Inner Workings
2010-04-10 · 30m
The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.
- E11
Stone Cottage – Insulation
2010-04-17 · 30m
The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
- E12
Stone Cottage – Geothermal
2010-04-24 · 30m
The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
- E13
His and Her Garage
2010-09-11 · 30m
The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."
- E14
Stone Cottage -- Interior Walls
2010-09-18 · 30m
After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
- E15
Stone Cottage -- Vaulted Ceilings
2010-09-25 · 30m
The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
- E16
Stone Cottage -- Millwork
2010-10-02 · 30m
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.
- E17
Stone Cottage -- Exterior Doors
2010-10-09 · 30m
The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
- E18
Stone Cottage -- Tile
2010-10-16 · 30m
The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
- E19
Stone Cottage -- Driveway
2010-10-23 · 30m
The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
- E20
Stone Cottage -- Interior Doors
2010-10-30 · 30m
The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
- E21
Stone Cottage -- Laundry Room
2010-11-06 · 30m
The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
- E22
Stone Cottage -- Office
2010-11-13 · 30m
The home office begins to take shape, as the custom staircase work begins.
- E23
Stone Cottage -- Countertops
2010-11-20 · 30m
The stone countertops are fabricated and installed.
- E24
Stone Cottage -- Fixtures and Appliances
2010-11-27 · 30m
The Hometime crew installs cabinets, countertops and landscaping.
- E25
Stone Cottage -- Retractable Screens
2011-01-22 · 30m
The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.
- E26
Stone Cottage -- Sod and Stone
2011-01-29 · 30m
The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.
