
The Old Gotthard Tunnel Route - Driver's Eye View
The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
- Status
- Released
- Budget
- —
- Box office
- —
- Language
- English
Top billed cast
Behind the camera
Writers
Produced in
United Kingdom
Videos
Release dates
United KingdomGB
- Physical1 Oct 2018
Frequently asked questions
The Old Gotthard Tunnel Route - Driver's Eye View was released on 1 October 2018.
Member reviews
Sign in to rate and review. Browsing stays free and open.
Sign inMember comments
0Sign in to post a comment. Browsing stays free and open.
Sign in












