Day-to-Day Track Maintenance Part II: Switches & Crossings
0.0(0)195221m1
Continuing the study of the normal tasks performed by a permanent-way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however complicated are built up.
- Status
- Released
- Budget
- —
- Box office
- —
- Language
- English
- transportation
- train
- instructional
Behind the camera
Director
Produced in
United Kingdom
Release dates
United KingdomGB
- Theatrical2 Jan 1952
Frequently asked questions
- When was Day-to-Day Track Maintenance Part II: Switches & Crossings released?
- Day-to-Day Track Maintenance Part II: Switches & Crossings was released on 2 January 1952.
- Where can I watch Day-to-Day Track Maintenance Part II: Switches & Crossings online?
- No verified streaming availability is listed for Day-to-Day Track Maintenance Part II: Switches & Crossings right now. Check back soon.
- Is there a Hindi trailer for Day-to-Day Track Maintenance Part II: Switches & Crossings?
- No verified Hindi trailer for Day-to-Day Track Maintenance Part II: Switches & Crossings is available yet. Only the original-language trailer is listed.
- What is the rating of Day-to-Day Track Maintenance Part II: Switches & Crossings?
- Day-to-Day Track Maintenance Part II: Switches & Crossings holds a 0.0/10 audience score from 0 votes.
- Who directed Day-to-Day Track Maintenance Part II: Switches & Crossings?
- Day-to-Day Track Maintenance Part II: Switches & Crossings (1952) was directed by C. David Lochner.
- How long is Day-to-Day Track Maintenance Part II: Switches & Crossings?
- Day-to-Day Track Maintenance Part II: Switches & Crossings runs for 21m.












