
Der letzte Postillon vom St. Gotthard
The title means "The last postillion (stage-coachman) of the St.Gotthard-pass". A company of select people joins the horse-driven coach for crossing the center of the Alps over the traditional path high on the mountain valley. It is the time of railways as the means of modernization. A tunnel is going to be built. The new fast way would render useless the small transport industry from which local people had made their living. The great mountainous landscape is the background for the conflicts which arise between rich and poor, local traditionalists and foreign modernizers. The daughter of a local, who is opposed against the tunnel, would like to get engaged with a tunnel engineer, but is also coveted by a local favored by her father.
TMDB
9.0/10
2 votes
- Status
- Released
- Budget
- —
- Box office
- —
- Language
- German
Top billed cast
Where to watch
All optionsAvailability for Switzerland. Provided by JustWatch through the TMDB API.
Release dates
AustriaAT
- Theatrical30 Apr 1948
GermanyDE
- TV12Filmdienst Freigabe1 Aug 2006
SwitzerlandCH
- Theatrical128 Nov 1941
Frequently asked questions
- When was Der letzte Postillon vom St. Gotthard released?
- Der letzte Postillon vom St. Gotthard was released on 8 November 1941.
- Where can I watch Der letzte Postillon vom St. Gotthard online?
- Der letzte Postillon vom St. Gotthard is available on Apple TV Store, blue TV in CH. Use the Watch now links in the Where to watch section for official pages.
- Is there a Hindi trailer for Der letzte Postillon vom St. Gotthard?
- No verified Hindi trailer for Der letzte Postillon vom St. Gotthard is available yet. Only the original-language trailer is listed.
- What is the rating of Der letzte Postillon vom St. Gotthard?
- Der letzte Postillon vom St. Gotthard holds a 9.0/10 audience score from 2 votes.
- Who directed Der letzte Postillon vom St. Gotthard?
- Der letzte Postillon vom St. Gotthard (1941) was directed by Edmund Heuberger.
- How long is Der letzte Postillon vom St. Gotthard?
- Der letzte Postillon vom St. Gotthard runs for 1h 22m.












