Another Romance of Celluloid: Electrical Power poster

Another Romance of Celluloid: Electrical Power

5.1(7)193810m1

This short begins at Boulder Dam (now Hoover Dam). The electricity generated here by the Colorado River is sent to Hollywood, where movie studios need it to make movies. After a tour of the MGM studios' power plants, we see short advertisements for upcoming MGM releases.

  • TMDB

    5.1/10

    7 votes

Status
Released
Budget
Box office
Language
English
  • behind the scenes
  • archive footage
  • instructional
  • electric power
  • power plant
  • motion picture studio
  • hoover dam
  • hollywood history
  • movie studio
  • featurette
  • film set
  • lake mead

Top billed cast

Release dates

  • United StatesUS

    • Theatrical12 Jan 1939

Frequently asked questions

When was Another Romance of Celluloid: Electrical Power released?
Another Romance of Celluloid: Electrical Power was released on 31 December 1938.
Where can I watch Another Romance of Celluloid: Electrical Power online?
No verified streaming availability is listed for Another Romance of Celluloid: Electrical Power right now. Check back soon.
Is there a Hindi trailer for Another Romance of Celluloid: Electrical Power?
No verified Hindi trailer for Another Romance of Celluloid: Electrical Power is available yet. Only the original-language trailer is listed.
What is the rating of Another Romance of Celluloid: Electrical Power?
Another Romance of Celluloid: Electrical Power holds a 5.1/10 audience score from 7 votes.
Who directed Another Romance of Celluloid: Electrical Power?
Another Romance of Celluloid: Electrical Power (1938) was directed by Herman Hoffman.
How long is Another Romance of Celluloid: Electrical Power?
Another Romance of Celluloid: Electrical Power runs for 10m.

Member reviews

More like this