
Another Romance of Celluloid: Electrical Power
5.1(7)193810m1
This short begins at Boulder Dam (now Hoover Dam). The electricity generated here by the Colorado River is sent to Hollywood, where movie studios need it to make movies. After a tour of the MGM studios' power plants, we see short advertisements for upcoming MGM releases.
TMDB
5.1/10
7 votes
- Status
- Released
- Budget
- —
- Box office
- —
- Language
- English
- behind the scenes
- archive footage
- instructional
- electric power
- power plant
- motion picture studio
- hoover dam
- hollywood history
- movie studio
- featurette
- film set
- lake mead
Top billed cast
Release dates
United StatesUS
- Theatrical12 Jan 1939
Frequently asked questions
- When was Another Romance of Celluloid: Electrical Power released?
- Another Romance of Celluloid: Electrical Power was released on 31 December 1938.
- Where can I watch Another Romance of Celluloid: Electrical Power online?
- No verified streaming availability is listed for Another Romance of Celluloid: Electrical Power right now. Check back soon.
- Is there a Hindi trailer for Another Romance of Celluloid: Electrical Power?
- No verified Hindi trailer for Another Romance of Celluloid: Electrical Power is available yet. Only the original-language trailer is listed.
- What is the rating of Another Romance of Celluloid: Electrical Power?
- Another Romance of Celluloid: Electrical Power holds a 5.1/10 audience score from 7 votes.
- Who directed Another Romance of Celluloid: Electrical Power?
- Another Romance of Celluloid: Electrical Power (1938) was directed by Herman Hoffman.
- How long is Another Romance of Celluloid: Electrical Power?
- Another Romance of Celluloid: Electrical Power runs for 10m.















